Technical debt means postponing problems rather than solving them.

The system becomes slower

Suppose a table is missing an index that the code expects to be present. It may not be a problem right now, but users experience the application becoming slower over time.

Unpredictable runtime errors

Microsoft has increased the maximum length of many code fields from 10 to 20 characters. Your code that depends on the field may still have a maximum of 10. It works as long as every code is shorter than 11 characters. But one day a colleague adds a new 15-character code, and the system fails.

In my experience, this kind of missing robustness behaves unpredictably. It might happen tomorrow or in five years. Nobody knows.

Maintenance costs increase

While the first two examples cause problems for users, the last issue is usually more about cost. Good programming standards may not always have been followed. Perhaps there was not enough time.

When I inspect the code as a programmer, there are two possibilities.

Either the code is good and follows the standards, allowing me to understand quickly what I need to do, or it does not, and I must perform a larger analysis before making my change.

That takes longer and therefore costs more.

Business Central is very different from Navision

First, we can now check more than 200 rules automatically. This means the developer is notified immediately, and doing it correctly does not cost extra.

Second, your Business Central environment is updated every month. This means your app must be maintained continuously.

Imagine that the interest rate on technical debt was 1% in Dynamics NAV; in Business Central, it is 10%.

Invest in quality and clean up the code.

Let me help you

Are you unsure about the level of technical debt in your solution?

Let me perform an analysis of the code.

I look forward to hearing from you.

Finn Pedersen

finn@finnpedersenfrance.com

Phone: +45 21 47 35 74